Electrician Everton Park
Everton Park is Brisbane's brick-and-tile renovation belt. Homes bought in the 1970s are being extended, split, or fitted out with a second dwelling — and almost none of the original switchboards can carry what gets added.
Jentech in Everton Park
A renovation belt outgrowing its original supply
Everton Park sits around ten kilometres north-west of the CBD, inside the area we cover from Yeerongpilly. The housing stock is mostly 1960s to 1980s brick-and-tile on generous blocks, and it is turning over steadily — bought, extended, subdivided, or fitted with a secondary dwelling.
Every one of those paths runs into the same wall. The original installation was sized for a single-phase supply, a handful of circuits, and no air conditioning. Add an extension, a second kitchen, ducted A/C, solar, and an EV charger, and the existing board is finished — usually with no spare ways and no RCD protection on the original circuits.
The second recurring question here is secondary dwellings. Whether a granny flat is separately metered or fed from the main installation is a decision with cost, compliance, and tenancy consequences, and it is much cheaper to get right at design stage than to unpick afterwards. We work through that with owners before anything is ordered.
Where we work: We're based in Yeerongpilly and cover Greater Brisbane — roughly 25km from the CBD, north side included.
Check your suburb →What Everton Park Jobs Need
Four things that decide an Everton Park job
Brick-and-tile stock hitting renovation age
1960s–1980s homes here are being renovated for the first time in decades. The wiring generally still works, which is exactly why owners are surprised when we recommend replacing it. Brittle insulation, no RCDs, and boards with no spare capacity are the standard findings.
Granny flats and dual occupancy
Secondary dwellings are common on Everton Park's block sizes. Whether the flat is separately metered or fed from the main installation changes the supply design, the metering, and what you can do with the tenancy later. That decision belongs at the start of the project, not the end.
Solar, battery, and EV stacking up
Owners rarely add just one. Solar goes on, then a battery is considered, then an EV arrives and needs a dedicated circuit. Each is fine alone; together they exceed what an original single-phase board and supply can carry. We size for the end state, not the first item.
South Pine Road light industrial and trade retail
The South Pine Road corridor runs workshops, trade suppliers, and light industrial tenancies. That work needs 3-phase distribution, high-bay lighting, machine circuits, and switchboard capacity planned around plant rather than appliances.
Services in Everton Park
What Everton Park owners call us for
Renovation Rewires
Full and partial rewires for brick-and-tile homes mid-renovation. Staged room by room so the household stays in place, with a Certificate of Electrical Safety on completion.
Learn more →Granny Flat & Secondary Dwelling Supply
Supply design, sub-mains, and metering for secondary dwellings — including the separate-versus-shared metering decision, made before the concrete goes down.
Learn more →Switchboard & Supply Upgrades
New RCD-protected boards and, where the load calls for it, Energex-coordinated single-phase to 3-phase conversion. Sized for what you're adding next, not just what's there now.
Learn more →EV Charger Installation
Dedicated 32A circuits for all major charger brands, or pre-wired during renovation at a fraction of the retrofit cost.
Learn more →Ducted & Split-System A/C
Design, installation, and commissioning, with the board and supply assessed before anyone quotes the ducting.
Learn more →South Pine Rd Commercial & Industrial
3-phase distribution, high-bay lighting, machine circuits, and switchboard work for workshops and light industrial tenancies along the corridor.
Learn more →Also covered nearby
We're usually already on the north side
These suburbs don't have their own page yet. That has nothing to do with whether we service them — they sit inside the same radius and the same daily run.
5.0★
166 Google reviews
80766
QLD Electrical Licence
3-phase
Supply upgrades
EV & solar
Ready installations
Questions We Get in Everton Park
Everton Park Electrician — FAQs
Is Everton Park in your service area?
Should a granny flat be separately metered?
Do I need 3-phase for a renovation in Everton Park?
Can I add circuits to my existing switchboard instead of replacing it?
What does a switchboard upgrade cost around here?
Can you pre-wire for solar and a battery we'll install later?
Do you service Mitchelton, Gaythorne, Enoggera, and McDowall?
Renovations, secondary dwellings & supply upgrades
Need an electrician in Everton Park?
Planning an extension, adding a granny flat, or stacking solar and an EV charger onto a 1970s board — get the supply sized before the build starts. We quote fixed-price after a site visit and tell you what the end state actually needs.
