Service Area

Electrician Everton Park

Everton Park is Brisbane's brick-and-tile renovation belt. Homes bought in the 1970s are being extended, split, or fitted out with a second dwelling — and almost none of the original switchboards can carry what gets added.

Jentech in Everton Park

A renovation belt outgrowing its original supply

Everton Park sits around ten kilometres north-west of the CBD, inside the area we cover from Yeerongpilly. The housing stock is mostly 1960s to 1980s brick-and-tile on generous blocks, and it is turning over steadily — bought, extended, subdivided, or fitted with a secondary dwelling.

Every one of those paths runs into the same wall. The original installation was sized for a single-phase supply, a handful of circuits, and no air conditioning. Add an extension, a second kitchen, ducted A/C, solar, and an EV charger, and the existing board is finished — usually with no spare ways and no RCD protection on the original circuits.

The second recurring question here is secondary dwellings. Whether a granny flat is separately metered or fed from the main installation is a decision with cost, compliance, and tenancy consequences, and it is much cheaper to get right at design stage than to unpick afterwards. We work through that with owners before anything is ordered.

Where we work: We're based in Yeerongpilly and cover Greater Brisbane — roughly 25km from the CBD, north side included.

Check your suburb →

What Everton Park Jobs Need

Four things that decide an Everton Park job

Brick-and-tile stock hitting renovation age

1960s–1980s homes here are being renovated for the first time in decades. The wiring generally still works, which is exactly why owners are surprised when we recommend replacing it. Brittle insulation, no RCDs, and boards with no spare capacity are the standard findings.

Granny flats and dual occupancy

Secondary dwellings are common on Everton Park's block sizes. Whether the flat is separately metered or fed from the main installation changes the supply design, the metering, and what you can do with the tenancy later. That decision belongs at the start of the project, not the end.

Solar, battery, and EV stacking up

Owners rarely add just one. Solar goes on, then a battery is considered, then an EV arrives and needs a dedicated circuit. Each is fine alone; together they exceed what an original single-phase board and supply can carry. We size for the end state, not the first item.

South Pine Road light industrial and trade retail

The South Pine Road corridor runs workshops, trade suppliers, and light industrial tenancies. That work needs 3-phase distribution, high-bay lighting, machine circuits, and switchboard capacity planned around plant rather than appliances.

Also covered nearby

We're usually already on the north side

MitcheltonGaythorneStaffordEnoggeraMcDowallEverton HillsBrooksideChermside

These suburbs don't have their own page yet. That has nothing to do with whether we service them — they sit inside the same radius and the same daily run.

5.0

166 Google reviews

80766

QLD Electrical Licence

3-phase

Supply upgrades

EV & solar

Ready installations

Questions We Get in Everton Park

Everton Park Electrician — FAQs

Is Everton Park in your service area?
Yes. We're based in Yeerongpilly and cover Greater Brisbane out to roughly 25km from the CBD. Everton Park is about 10km north-west — well inside it. The suburbs with their own pages on this site are the ones where we have the most published project history, not the edge of where we travel.
Should a granny flat be separately metered?
It depends on what you intend to do with it. Separate metering means the occupant holds their own supply account and pays their own usage, which matters if you're renting it out; it also costs more up front and requires Energex involvement. Feeding it from the main installation is cheaper but leaves you billing and apportioning usage yourself. It's worth deciding before the slab goes down, because retrofitting separate metering afterwards means new sub-mains and a second Energex process.
Do I need 3-phase for a renovation in Everton Park?
If you're adding ducted air conditioning, an EV charger, solar with a battery, and a second kitchen, almost certainly. Single-phase supply is typically maxed out by any two of those running together. The Energex supply upgrade runs 2–4 weeks of lead time and coordinates with a scheduled outage — we handle the paperwork and the timing. Cost varies with distance to the street pole and whether trenching is needed.
Can I add circuits to my existing switchboard instead of replacing it?
Sometimes, but on 1970s and 1980s Everton Park boards it's usually false economy. Older boards often have no spare ways, no RCD protection on the existing circuits, and breakers that are no longer manufactured. You'll spend real money bolting onto a board that still has an expiry date. A new board with deliberate spare capacity is generally a one-day job and lasts thirty years.
What does a switchboard upgrade cost around here?
Most straight residential board swaps sit in the $1,800 – $3,500 range. If the meter needs relocating as well — an external position change, a 3-phase upgrade, or an underground conversion — add roughly $2,500 – $6,000 including Energex connection fees, permits, and usually two site visits. Those are indicative Brisbane market ranges, not our rate card; every job is quoted fixed-price after a site visit.
Can you pre-wire for solar and a battery we'll install later?
Yes, and it's much cheaper than retrofitting. We run conduit to the roof for the DC solar runs, leave a supply way in the board for the inverter, and allow space for a battery and its enclosure. If the installation is three to five years away it still pays to do the groundwork while the walls are open.
Do you service Mitchelton, Gaythorne, Enoggera, and McDowall?
Yes — all of them, plus Everton Hills, Stafford, and the rest of the north-west. The housing stock and the renovation pattern are near enough identical across the area.

Renovations, secondary dwellings & supply upgrades

Need an electrician in Everton Park?

Planning an extension, adding a granny flat, or stacking solar and an EV charger onto a 1970s board — get the supply sized before the build starts. We quote fixed-price after a site visit and tell you what the end state actually needs.